top of page

Building a Legacy Timber Frame Home

#11 Timber Frame Raising Day 1

  • angelaglong
  • 6 days ago
  • 2 min read

This is a day we've been waiting for for such a long time! The day our beautiful timber frame, the heart of our new home, rises up from the floor boards. And the day was absolutely glorious in many ways including the weather!


When we arrived the rafters (shown here) and all the pieces were staged and ready to go!
When we arrived the rafters (shown here) and all the pieces were staged and ready to go!
The first post goes up.  A crew of five from Lancaster County Timber Frames is working today, including Josh Coleman, who helped raise our original timber frame in 2002.
The first post goes up. A crew of five from Lancaster County Timber Frames is working today, including Josh Coleman, who helped raise our original timber frame in 2002.
The crane and operator Jacob, and photographer Andrew.
The crane and operator Jacob, and photographer Andrew.
LCTF hired photographer Andrew to take pictures and do drone footage.  He also grabbed some pics of us!
LCTF hired photographer Andrew to take pictures and do drone footage. He also grabbed some pics of us!
A fun shot looking through the rafters.
A fun shot looking through the rafters.
Setting the last post for the west wall.  This end is where our kitchen will be.
Setting the last post for the west wall. This end is where our kitchen will be.
The west wall is done and another post for the east wall is "flying" in by the amazing crane operator Jacob.
The west wall is done and another post for the east wall is "flying" in by the amazing crane operator Jacob.
A second post on the east wall is set in place.
A second post on the east wall is set in place.
More posts and beams on the east wall.
More posts and beams on the east wall.
A zebra swallowtail butterfly graced us with its presence today.
A zebra swallowtail butterfly graced us with its presence today.
Josh is setting a post for the foyer.
Josh is setting a post for the foyer.
The first Arch Chord King Post truss is being lowered onto the posts.  This particular truss has the name of our property and the year of the timber frame raising (Timber Oaks, 2026)
The first Arch Chord King Post truss is being lowered onto the posts. This particular truss has the name of our property and the year of the timber frame raising (Timber Oaks, 2026)
Here you can see the carving.
Here you can see the carving.
The trusses are 14' above the floor in the great room!
The trusses are 14' above the floor in the great room!
Josh and John the intern from Thaddeus Stevens Institute. John got to help carve the frame in the shop and raise it at our property.
Josh and John the intern from Thaddeus Stevens Institute. John got to help carve the frame in the shop and raise it at our property.
Craig at the end of the day in the eventual dining room...the great room is behind him.  An amazing Day One!
Craig at the end of the day in the eventual dining room...the great room is behind him. An amazing Day One!

 
 
 

1 Comment


katysusanne
4 days ago

What a beautiful home this is going to be for you and Craig! Thank you for sharing your home building journey with us! Love seeing your perspective :)

~ Kate (Josh's wife)

Like
bottom of page