It's been a while since we posted and lots of work has been happening at Timber Oaks!
Since we last posted we've had interior framing, plumbing, and electric. For the exterior, windows the tongue and groove on the front porch have been installed.
Looking south out of the new kitchen windows. We can see folks coming down the driveway. The blue tape outlines where the cabinets, appliances, and island will be.
A division of Hess Homes does trusses, and these beauties are in every room with a gable (the two rear bedrooms, the office/third bedroom, and the mudroom.
The flue to our woodstove was installed. We'll have a faux fireplace surrounding it, with beautiful stone veneer.
Electric is connected now and the wiring is happening.
Lots of decisions made and yet to be made when it comes to electric and lighting.
Plumbing was installed throughout the house.
Beautiful Douglas fir tongue and groove panels installed on the timber framed porch. The porch will have a metal roof, while the rest of the roof will be shingles.
Another view of the front porch, with Craig looking out the eventual front door!
Part of our Hess Homes team: Owner Randy Hess and Project Manager Phil Sensenig.
We are happy that this toad and others are hanging out near our front porch. We name it Winston in honor of the toad who hung out at our porch at Timber Springs!
Comments